| DISASTER
RECOVERY
JOURNAL
P. O. Box 510110
St. Louis, MO 63151
(314) 894-0276
Fax: (314) 894-7474
Internet
www.drj.com
E-mail drj@drj.com
PUBLISHER &
EDITOR-IN-CHIEF
Richard L. Arnold, CBCP
richard@drj.com
SENIOR EDITOR
Janette Ballman
janette@drj.com
MANAGING EDITOR
Jon Seals
jon@drj.com
COPY EDITORS
Richard Sandhofer
richards@drj.com
Pamela Clifton
pamelaclifton@hotmail.com
ADVERTISING
Robert Arnold
bob@drj.com
_____________
Corporate
President/CEO
Richard L. Arnold, CBCP
richard@drj.com
Vice
President
Robert Arnold
bob@drj.com
CONFERENCE COORDINATOR
Patti Fitzgerald, CBCP
patti@drj.com
CONFERENCE REGISTRAR
Merce Knese
mercedes@drj.com
CIRCULATION
Laura Baugh
laurab@drj.com
EXECUTIVE
COUNCIL
Jeff Dato, MBCP, KPMG
John Jackson, J Albright Advisors
Edward Devlin, E.S. Devlin & Associates
James Hammill, CBCP, JMH Consulting
Pat McAnally, SunGard Availability
Brian Turley, Strohl Systems
Belinda Wilson, Hewlett-Packard
INTERNATIONAL
CONTACTS
England: Thom Hetherington
Business Continuity
Phone: 0161-237-1007
thomh@tempus.demon.co.uk
Australia: Anthony J. Harvey
Journal of Business Continuity
Phone: 0011-613-953-0055-8
fax: 0011-613-953-0528
sector@notability.com.au
Japan: Shinji Hosotsubo
Quake Japan Co., Ltd.
Phone: 03-3215-2880
fax: 03-3215-2881
Brazil:
Jose Carlos Ferreira
Disaster Recovery Mercosul
Phone: 55
11 3666-9506
conc2000@uol.com.br
www.drms.com.br
|
|
Click
Here for a Printable Version

Measuring Perceived Business
Continuity Readiness of An Organization
By TERRI KIRCHNER, MBCP & KIRAN KARANDE, Ph.D.
In today’s “24x7” technology-oriented
and customer-centered world, customers expect organizations to maintain
continuous availability and accessibility of products and services.
As a result, managers must ensure that organizational processes and
supporting systems continue to function in the event of disasters or
severe outages. Business continuity planning, as defined by the DRI
International and the Disaster Recovery Journal, is “the process
of developing advance arrangements and procedures that enable an organization
to respond to an event in such a manner that critical business functions
continue with planned levels of interruption or essential change.”
Done well, this planning process leads to business continuity readiness
or the readiness of an organization for a disaster or severe outage.
This article presents the concept of perceived organizational business
continuity readiness and the results of a research project that developed
a tool to measure it. The questionnaire developed in this research is
an assessment tool that managers can use to evaluate perceived readiness
at both a firm level, and potentially, at an industry level. It is important
to note that, since the questionnaire captures the perceptions of individuals
about their organizations, this survey assesses perceived organizational
business continuity readiness, not actual readiness.
We developed and tested this measurement tool using generally accepted
statistical procedures for scale development proposed by Gilbert Churchill
(1979). Our research steps are outlined in Table 1. The purpose of this
type of research is to develop a comprehensive set of questions to measure
a concept and then reduce the number of questions to a manageable number,
with a minimum loss of information, while ensuring the validity and
reliability of the resulting survey. In the following sections, after
we describe the procedure for constructing and refining the measurement
questionnaire, we demonstrate how managers can use it as a tool. We
show how our results can help managers to assess the perceived readiness
of their organizations, using norms developed for perceived business
continuity readiness which are provided for several categories, including
industry, size of the organization, and certification level and perceived
expertise of the responders. We conclude by suggesting opportunities
for future research.
The Research Process
Defining Perceived Organizational BC Readiness
We developed our definition of perceived organizational business continuity
readiness based on a review of prior academic work, business-oriented
research, and input from industry experts and members of professional
organizations. Based on this background research, we defined perceived
organizational business continuity readiness as “the perceived
ability of an organization to keep functioning until its normal facilities
are restored after a disaster or disruptive event.” This concept
encompasses the importance of risk and business impact assessments,
development of business continuity strategies and plans, implementation
of infrastructure and procedures necessary to make those plans operational,
and exercises and periodic updates of completed plans.
Generating Survey Items
We generated an initial sample of survey questions based on a review
of prior academic and business literature on the topic. We reviewed
DRI International’s “Professional Practices for Business
Continuity Planners” and examined four years of weekly survey
questions posted by the Disaster Recovery Journal on its Web site from
1999-2002. Additionally, we conducted experience surveys, using in-depth
interviews with five industry experts as well as an online discussion
involving a list-serve of 57 Master Certified Business Continuity Professionals
(including business continuity planners, managers, and vendors). As
a result of this process, we identified 56 survey questions which used
a seven-point scale of agreement/disagreement to measure the concept
of perceived organizational business continuity readiness.
Collecting Data – Survey No. 1
We implemented an on-line version of the questionnaire using Inquisite
survey software and posted the survey announcement and link on the Disaster
Recovery Journal Web site. Our target population consisted of executives,
managers, employees, and vendors with a specific interest in business
continuity planning. Two sampling units were used: Disaster Recovery
Journal Web site visitors and Disaster Recovery Journal on-line newsletter
recipients. Participants were offered the results of the survey as an
incentive to complete it.
The questionnaire was structured (all responders replied to the same
questions) and undisguised (there was no attempt to hide the purpose
of the study). The survey consisted of the 56 survey items and four
additional demographic questions related to perceived expertise (novice,
intermediate, or expert), certification status (certified/not certified),
size of the organization in terms of number of employees, and primary
industry of the organization. For each of the survey items, responders
were asked to indicate the extent to which they agreed with each statement
on a seven-point scale ranging from “completely disagree”
to “completely agree.” The survey was pre-tested for clarity
and functionality by three subjects with no business continuity planning
experience and for question clarity and understanding by five experts.
The responses of those pretest participants were then dropped from further
analysis. There were 491 surveys submitted; of those, 432 were answered
completely with no missing responses to any of the items. Approximately
one-fourth of the responders requested the survey results via a separate
e-mail, indicating significant interest in the study.
Reducing the Number of Survey Items – Survey No. 1
We analyzed the completed surveys using a cycle of reliability analysis
and factor analysis. To assess reliability, we checked the extent to
which responses to each item are consistent with those for other items,
using correlations and Cronbach’s alpha (a measure for reliability).
Items with low consistency were dropped. We used factor analysis to
determine whether a small number of underlying dimensions (called factors)
could summarize the information contained in the large number of questions,
and we were able to identify and name five such factors. We deleted
items that were not shown to be neatly summarized by an underlying factor
(in technical terms, those with low loadings and cross-loadings). Based
on reliability analysis and factor analysis, we were able to reduce
the number of items to 23, with five underlying dimensions that explained
about 70 percent of the variance. These 23 items were then used to collect
additional data in a second round of data collection.
Collecting Data – Survey No. 2
To collect a second round of data, we used a paper survey that was distributed
in the on-site attendee packages at the Disaster Recovery Journal’s
semi-annual conference in March 2005. The survey consisted of the 23
items identified in the prior step and other demographic questions.
There were 129 surveys collected at the conference from a pool of 895
registered attendees. Of those, 126 were complete, useable surveys.
Reducing the Number of Survey Items – Survey No. 2
We reduced the number of items further using reliability analysis and
factor analysis (as outlined above). Our criteria for dropping items
were low consistency and lack of clear association with any underlying
dimension. Based on the above analysis, we eliminated 12 of the 23 variables.
For the remaining items, reliability was high – .9 for the entire
scale. Four factors (or categories of items) were found, which explain
83 percent of the total variance in the 11 items. The reliability of
each of the four factors was greater than .7, indicating that the component
items of each factor are highly correlated and are statistically measuring
the same construct. We could easily name the four factors, based on
their component items: business impact analysis (recovery time objective/recovery
point objective), emergency response readiness, business continuity
planning exercise, and resource sufficiency. The results of the analyses
are displayed in Table 1.

Confirming the Results of the Survey
We further assessed the validity of the 11-item, four-factor model proposed
to measure perceived organizational business continuity readiness, which
was finalized by analyzing data from Survey No. 2, by using confirmatory
factor analysis to analyze the corresponding data from Survey No. 1.
The goodness-of-fit statistics (GFI – .96, CFI –.98) are
high (excellent) and support the proposed model.
Developing Norms to Use With Future Surveys
As previously mentioned, we collected demographic data from survey responders,
which allowed us to develop some norms. Table 2 shows the average (mean)
responder score (for the sum of the 11 items) for responders from organizations
of different size (in terms of number of employees), those from different
industries, those with different levels of experience, and those with
different professional certification status. As you can see, responders
from larger organizations (in terms of number of employees) perceived
their organization’s readiness as higher than those from smaller
organizations. Also, responders from financial/banking and insurance
organizations perceived their organization’s readiness as relatively
high, while those from the education, manufacturing, and retail/wholesale
sectors perceived it as relatively low. We also found that responders
who perceive their level of expertise in the area of business continuity
planning as “advanced/expert” or “intermediate”
perceived their organization’s readiness as higher than those
who classified themselves as “novice.” Responders who have
earned a professional certification in the area of business continuity
planning perceived their organization’s business continuity readiness
as higher than those who have not earned such a certification.
As this survey tool is used to collect more data, analysis of that data
can be used to refine these norms.
It’s important to keep in mind, when looking at these results,
that what is being measured with this survey is perceived, not actual,
organizational business continuity readiness. It is possible that an
organization that is perceived by an individual responder as ready for
a disaster or severe outage situation may not actually be ready for
such a situation. An organization that is perceived by an individual
as not ready for such a situation may, in fact, be ready to function
well if it occurs.

How Can You Use This Managerial Tool?
To use this 11-item measurement tool, a responder should answer each
of the 11 items in the survey outlined in Table 3. The responses for
the 11 items should then be totaled. (That total of the 11 items will
range from 7 to 77.) If you use this survey for multiple responders,
you can average the results of those 11-item totals.
Table 2 shows the average (mean) respondent score (for the sum of the
11 items) for the demographic factors discussed earlier. You can compare
totaled scores (sum of the 11 items) from responders in your organization
with those means to make a relative assessment. Readiness of your organization
can also be evaluated for each of the four overall factors or dimensions
(e.g. resource sufficiency). Organizations can also use this questionnaire
periodically (e.g. annually) and evaluate the improvement or deterioration
in perceived readiness over time.

Managerial and Research Implications
From a management perspective, survey participant feedback indicates
that the study has substantial interest and value. It supports the study’s
premise that a business continuity readiness scale can provide an evaluation
tool for executives and an operational tool for managers to be used
to measure and assess perceived readiness at both a firm level and,
potentially, an industry level. The information that it provides might
be used to formulate a scorecard, or balanced scorecard component, useful
for updating executive management, boards of directors, internal and
external auditors, industry analysts, investors, and other stakeholders.
From an industry standpoint, consultant and vendor input related to
the first phase of this project indicates the study has practical value.
While some non-academic work has been done on this topic by research
organizations (e.g. Gartner Group and vendors), to our knowledge, this
study is the first of its type to develop a measurement scale for perceived
organizational business continuity readiness with high reliability and
validity. This academic work, which is available to the entire business
continuity community, has the potential to fill a marketing research
information void for consultants and small vendors who do not have,
and may not be able to afford, the expense of research tools and capabilities
used in this study.
From an academic perspective, feedback from business continuity researchers
and members of the academic community indicates that no previous constructs/scales
for organizational business continuity readiness and its antecedents/consequences
have been developed by academic researchers, and that this research
has significant potential to add academic value.
Opportunities for Future Research
What’s next in terms of research on this topic? We see several
opportunities. First, we’d like to use the measurement scale developed
in this study within large organizations to assess whether or not the
perceptions of managers and business continuity professionals within
the same firm tend to be similar in terms of its business continuity
readiness. We also plan to assess potential antecedents of perceived
organizational business continuity readiness, such as the organizational
characteristics of centralization, formalization, risk aversion, and
technological turbulence. Third, we plan to conduct research to establish
potential consequences (results, effects) of perceived organizational
business continuity planning. Finally, a new research effort, to develop
an assessment tool for actual organizational business continuity readiness,
which can be compared and contrasted with this perceived organizational
business continuity readiness tool, would be valuable.
Terri Kirchner, MBCP, is an instructor and researcher with Old
Dominion University in Norfolk, Va. She has been a member of the Disaster
Recovery Journal Editorial Advisory Board for six years and is a recently-elected
member of the DRI International Certification Commission. She welcomes
comments and questions regarding this article at tkirchne@odu.edu.
Kiran Karande, Ph.D., is an associate professor with Old Dominion University
in Norfolk, Va. His expertise and research interests include research
methodology, promotions, retailing, and international marketing.