| DISASTER
RECOVERY
JOURNAL
P. O. Box 510110
St. Louis, MO 63151
(314) 894-0276
Fax: (314) 894-7474
Internet
www.drj.com
E-mail drj@drj.com
PUBLISHER
Richard L. Arnold, CBCP
richard@drj.com
EDITOR-IN-CHIEF
Jon Seals
jon@drj.com
SENIOR EDITOR
Janette Ballman
janette@drj.com
COPY EDITORS
Richard Sandhofer
richards@drj.com
Pamela Clifton
pamelaclifton@hotmail.com
ADVERTISING
Robert Arnold
bob@drj.com
_____________
Corporate
President/CEO
Richard L. Arnold, CBCP
richard@drj.com
Vice
President
Robert Arnold
bob@drj.com
CONFERENCE COORDINATOR
Patti Fitzgerald, CBCP
patti@drj.com
CONFERENCE REGISTRAR
Merce Knese
mercedes@drj.com
CIRCULATION
Laura Baugh
laurab@drj.com
EXECUTIVE
COUNCIL
Jeff Dato, MBCP, KPMG
John Jackson, J Albright Advisors
Edward Devlin, E.S. Devlin & Associates
James Hammill, CBCP, JMH Consulting
Pat McAnally, SunGard Availability
Brian Turley, Strohl Systems
Belinda Wilson, Hewlett-Packard
INTERNATIONAL
CONTACTS
England: Thom Hetherington
Business Continuity
Phone: 0161-237-1007
thomh@tempus.demon.co.uk
Australia: Anthony J. Harvey
Journal of Business Continuity
Phone: 0011-613-953-0055-8
fax: 0011-613-953-0528
sector@notability.com.au
Japan: Shinji Hosotsubo
Quake Japan Co., Ltd.
Phone: 03-3215-2880
fax: 03-3215-2881
|
|
Click
Here for a Printable Version
Strategies
for Achieving High Availability
By RANDY MacCLEARY
Managing the availability of mission critical systems requires an
understanding of the risks and costs of losing access to business critical
information or services balanced against the cost of achieving a certain
level of availability.
That balance is shifting toward higher levels of availability as network
services becomes essential to business continuity and the cost of downtime
escalates. A February 2004 study by Infonetics Research revealed that
interruptions in enterprise availability cost large companies an average
of 3.6 percent of annual revenues.
As a result, IT managers face growing pressure to drive network availability
to unprecedented levels. At the same time, Voice over Internet Protocol,
radio frequency identification, just-in-time inventory, lean manufacturing
and point-of-sale integration are placing new demands on networks – and
the systems that support them.
This pressure is not limited to the data center. For an increasing
number of organizations, the network itself is mission critical. It
may not always be possible for remote systems to achieve the same levels
of availability as those in the data center, but the gap can be closed
by applying the strategies and technologies used in the data center
to systems outside it.
According to the Uptime Institute, 25 percent of all information downtime
results from the interaction of computer hardware with its physical
environment. Continuous availability of mission-critical systems rests
not only upon flawless operation of the systems themselves, but on
the infrastructure that supports those systems. Achieving “five
nines” network availability requires installation and management
of an infrastructure that supports continuous availability.
This requires four key components:
- Mission critical power
- Mission critical cooling
- Monitoring and management
- Proactive maintenance
Power Availability
IT systems have two connections to the outside world: a connection
to electrical power and a connection to the network. Without power,
information technology becomes worthless. Unfortunately, the modern
power grid does not adequately support IT operations – and
it appears to be getting worse.
Electricity demand has jumped 30 percent over the past 10 years, while
transmission capacity has increased only half that amount. As seen
in August 2003, a strain in one location can cause the whole system
to buckle. That outage represented the fourth major failure of the
central power grid within the last decade. Consequently, each organization
must create a power infrastructure that can deliver the power quality
and reliability IT systems require. Accomplishing this involves selecting
the right equipment and system architecture.
UPS Technology
Uninterruptible power supply (UPS) systems can use either passive standby,
line-interactive or double-conversion technology. When availability
is a high priority, true online double-conversion technology is the
clear choice. Double-conversion systems can tolerate long power fluctuations
without transferring to battery power. They also completely isolate
mission critical systems from the power source, while line-interactive
UPSs can allow equipment-damaging power anomalies to pass through.
This is exactly what occurred at a Manhattan data center that used
both line interactive and double-conversion UPS systems before the
August 2003 blackout.
During the blackout, batteries in the line interactive UPS units lacked
the capacity to support equipment while backup generators started up.
Many shut down before their rated backup time and dropped loads unexpectedly.
Power supplies on seven servers connected to line interactive UPS units
were destroyed.
System Architecture
Power system architecture plays a major role in achieving appropriate – and
cost effective – availability. When evaluating a power architecture,
two questions should be kept in mind:
1. Have single points of failure been identified and eliminated everywhere
it is cost-effective to do so?
2. Is this the simplest architecture to achieve the availability requirements
of the organization?
Power system architectures can be classified into four tiers. Moving
up the tiers increases availability, but requires increased investment.
The first tier provides only protection against surges, therefore delivering
the same level of availability as the utility source. The second tier
adds a UPS, but without redundancy, thus requiring downtime for UPS
service. Tiers three and four introduce redundancy to eliminate single
points of failure and are used in high-availability data centers.
The highest availability is achieved in a tier four dual bus system
that creates parallel power paths to eliminate single points of failure
from the point power enters the room to point at which it is used.
The N + 1 architecture used in some tier three systems – in which
N is the number of UPS units required to support the load and “+1” is
an additional unit for redundancy – can be used to balance availability,
cost and scalability; however, as modules are added to the system,
complexity goes up and reliability goes down. In statistical analysis
of N + 1 systems, 3 + 1 appears to be the threshold at which the risks
to network availability outweigh the benefits of scalability.
Protecting Remote Applications
Outside the data center, many of the same principles and solutions
apply. However, these environments typically don’t have access
to a backup generator, so UPS battery capacity determines how long
systems can run in the event of an outage. Where 10 or 15 minutes
of battery capacity is typical in the data center, this is usually
not enough outside the data center, particularly as new applications
like IP telephony are deployed. These systems often require as much
as four hours of battery backup to ensure phones can continue to
operate in the event of an outage.
In terms of topology, systems outside the data center are becoming
more powerful and more critical, and are outgrowing the protection
provided by line-interactive systems. As in the data center, double-conversion
UPS should be specified for any application considered mission critical.
Because the UPS system is often located in the same rack as the equipment
being protected, redundancy is simpler in network closets than it is
in the data center, where the UPS system is supporting multiple racks
spread across the room. And, with the reduced size of today’s
rackmount UPS systems, 1 + 1 redundancy is feasible in remote environments
and can deliver very high availability. At minimum, the UPS should
be configured with an external bypass to allow power to be routed around
the UPS during service or in the event of a failure.
Heat Removal
Heat removal is also critical to ensuring network availability. Heat
removal becomes even more critical as the trend toward server consolidation
accelerates. Packing more processing power into a smaller space and
packing more servers in each rack can test and even exceed the limits
of raised-floor cooling.
Facilities have dealt with this situation by increasing rack spacing,
essentially distributing the heat from the equipment over a larger
space. This offers, at best, an interim solution. Increasing rack spacing
quickly consumes available data center space while reducing the number
of racks that the data center can support. Combining room-level precision
cooling with supplemental high-density cooling offers the most economical
and energy efficient solution.
Consider a typical 10,000-square-foot data center. Assuming average
rack power densities of 1 kW, racks take up approximately 35 percent
of the floor space. This leaves 65 percent of space for aisles and
support systems. If a typical rack consumes about 7 square feet of
floor space, this facility can support up to 500 racks of 1 kW each.
When average power density increases to 10 kW per rack, the data center
must increase rack spacing to spread the heat load across the room.
Now racks can use only 3.5 percent of the space in the room and the
facility can support only 50 racks.
Assuming a data center shell cost of $200 per square foot and cooling
costs of $925 per kW with a cooling system designed for densities of
50 Watts per square foot, a 10,000-square-foot facility costs $2.46
million. At rack densities of 1 kW, the cost is $4,920 per rack.
When rack densities increase to 10 kW, shell and cooling costs stay
the same, but now the same infrastructure can support only 50 racks.
Consequently, the cost to support each rack grows by a factor of 10
to $49,200.
Although supplemental cooling boosts cooling-system costs, it also
supports closer equipment arrangement. With supplemental high-density
cooling, the 10,000-square-foot data center can support 386 racks of
10 kW each – a 700 percent increase in capacity. This drives
support cost per rack down to $7,128 – less than 15 percent of
the cost of a solution that relies on rack spacing.
Outside the data center, sensitive electronics too often rely on building
air conditioning for heat removal. This approach does not provide adequate
cooling, particularly during off hours or winter months. As equipment
densities and power requirements outside the data center rise, problems
created by this approach will become more prevalent.
Two solutions now exist for these environments. Compact, ceiling-mounted
cooling units can provide dedicated, year-round cooling for small room
and closet environments. Special enclosures are also available that
integrate cooling within a sealed rack to create a protected environment
for equipment outside the data center.
Another challenge that is being presented by rising densities is the
rate at which rooms heat up when an outage occurs. UPS-protected systems
continue to operate and generate heat, but the cooling system shuts
down, causing heat to accumulate in the room or rack. At densities
of 150 Watts per square foot, it takes a room approximately 13 minutes
to go from 70 degrees F to 95 degrees F. When densities increase to
300 Watts/square foot, that time is reduced to eight minutes. At 450
Watts per square foot, the room heats to 95 degrees F in about two
minutes.
This problem caused wireless service failures during the Great Blackout
of 2003. Critical systems shut down while they still had ample battery
capacity because of heat buildup in the room in which they were operating.
In the data center, precision cooling systems should be supported by
a backup generator whenever possible Outside the data center new enclosure
systems are now available with battery protected fans to exhaust heat
out of the rack during an outage.
Monitoring and Management
Despite increasing pressure to boost network availability, support
system management remains an under-used strategy for maintaining
and elevating availability. By collecting data that can serve as
a basis for a preventive maintenance program and providing early
warnings to the right people at the right time, monitoring solutions
can help avoid disaster. At the least, they support faster recovery.
A basic approach to support system monitoring should cover mission
critical power and cooling systems. As availability needs rise, monitoring
can be extended to other support equipment, such as generators, automatic
transfer switches, physical security systems and leak detection systems.
For systems operating outside the data center, critical system management
provides essential visibility and control. Communication cards in remote
UPS systems provide a constant update of UPS status and enable remote
restart of connected equipment. Temperature monitors can be installed
in racks or small rooms to ensure heat does not reach dangerous levels.
These inputs can be integrated into the centralized monitoring system
in the data center or into a network management system.
Because the IT and facility management departments often share responsibility
for vital support systems, an effective monitoring strategy provides
each with the information they need in a manner that is consistent
with the way they monitor and maintain other systems within their responsibility.
This requires that monitoring components support both the Modbus and
BACnet protocols used by building management systems and SNMP, which
is standard for network management systems.
Service
Maintaining support-system availability requires a well-coordinated
preventive maintenance and emergency service strategy that addresses
both mechanical and electrical systems.
Organizations that choose to handle maintenance themselves should work
with support-system vendors to identify an effective preventive maintenance
schedule and to obtain instructions for handling failures. They must
also obtain a list of parts to keep on hand to aid prompt recovery
in the event of a failure. That inventory should be included in total
ownership cost calculations. The wait time to receive parts not kept
on hand should also go into evaluating the do-it-yourself approach.
When striving for high availability, working with a professional service
organization offers several advantages. Most importantly, it ensures
required uptime through 24-hour service support. In addition to reducing
the frequency of failures and speeding recovery time, professional
service also removes the burden of maintenance from IT staff members,
allowing them to focus on managing the network. Systems outside the
data center should be integrated into an overall proactive service
strategy that includes regular preventive maintenance.
Conclusions
Any significant change in an organization’s physical structure,
technology deployment or business objectives should trigger a reevaluation
of the four elements of its physical support plan – power, heat
removal, monitoring and service management.
The most reliable critical power systems minimize or eliminate single
points of failure in the simplest way possible and have the flexibility
to adapt to future requirements.
Outside the data center specify double conversion UPS systems, carefully
evaluate battery requirements and make sure that taking the UPS offline
doesn’t require connected equipment to be shut down.
From a cooling perspective, be aware of the increased heat loads being
created by new high density systems. New solutions to cooling have
been developed specifically for these systems. Increasing densities
will also drive increased use of dedicated precision cooling systems
outside the data center.
Systems across the network should be monitored for both alarm conditions
and to collect data on system operation. A service strategy that focuses
on keeping systems running, rather than one that deals with problems
after a failure has occurred, ensures systems achieve capable levels
of availability.
Randy MacCleary, vice president and general
manager, UPS Business, Liebert North America, has more than 24 years
of experience in the uninterruptible power supply industry. He has
spent the last 12 years at Liebert. In his current role, MacCleary
is responsible for the strategic direction and operating performance
of Liebert’s
power business, including single-phase and three-phase products around
the world.