CONTINGENCY RECOVERY AND
RESURGENT PLANNING
By Don Edwards
Most contingency plans today are developed for recovery purposes only. Generally, this means that only high priority functions
and bare minimum needs for the recovery process are contained in the plan. This is the logical approach since contingency planning
is preparing for an emergency or disaster situation where recovery, not replacement, is the main objective. However, for most
corporations and businesses, this only covers half of the needs during the difficult and sometimes lengthy process of getting back to
Business As Usual.
Most contingency plan manuals will list minimal (key) personnel, furniture, equipment, supplies, accompanied by offsite storage
materials and recovery action plans. Reciprocal agreements, Hot-Cold- Shell Site contracts, telecommunications backup, and
vendor support usually accompany the manual to make up the bulk of most contingency plans. However, as any company who has
experienced an actual emergency or disaster can tell you, at some point-in-time you must move back to either a new site or your
former site once the cleanup work is completed. If there is no plan for this portion of the emergency recovery process, when an
emergency occurs, you may find yourself spending more time and money than necessary to complete the transition back home.
Hot Site occupations are very expensive, and even though most companies have either Business Interruption or Extra Expense
Insurance to cover these costs during an emergency, the coverage may not be enough to handle all of the costs involved, especially
for long duration occupations. Daily Hot Site usage fees for an IBM 3081K run approximately $10,000 per day. Combine these
costs with telecommunications charges, charter jet and ground transportation, hotel and per diem expenses for alternate site
personnel, and airfare expenses and the cost of doing business away from home multiplies rapidly with each day that passes. Once
you have performed an approximate cost analysis for an emergency alternate site occupation, you will understand the need to
minimize, through planning, the amount of time that your company will occupy the site.
The best way to approach this type of contingency planning is by separating your plan into two distinct phases. The first phase is
the Recovery Phase; emphasizing minimal requirements to stay in business. The second phase is the Resurgent Phase; which
primarily deals with complete replacement of all facets of the business to the level they were prior to the emergency. There can be
any number of phases in your plan, however, Recovery and Resurgent phases will likely be the largest and most critical.
The Recovery Phase has been outlined fairly well in many previous articles, User conferences and classes, and can be developed
through the use of many disaster recovery software packages now on the market. One area which I feel needs clarification
concerning the Recovery Phase is what is meant by minimal needs. When discussing minimal needs with Department Managers
and Emergency Team Leaders, can you be sure that they all perceive minimal needs to mean the least you can get by with and still
maintain a high level of service to the User and the customer, or is there perception simply the least you can get by with? In a recent
department plan review, I asked a department manager if the list of equipment that he had drafted for emergency recovery could,
when operational, maintain the same level of service that he was currently providing to his User. He replied; No, but in an
emergency situation we couldnt expect to get all the equipment we would need, especially on such short notice!. My reply was;
Maybe not, but you certainly wont get it if you dont ask for it!. Minimal needs simply means cutting out the non-essential
personnel, materials, equipment, etc. that do not play an important role in the daily business processes. It is very likely that many
items, especially vendor exclusive equipment, will be hard to obtain during an emergency. However, it is better to be prepared to
request everything that you will need to maintain your customer base rather than to risk losing business simply because you didnt
ask for what you needed.
The Resurgent Phase is primarily a list of fixed assets which can be drafted in very much the same format as the documents that
make up the Recovery Phase. Floor plans, equipment and furniture lists, electrical and telecommunication needs, supplies, etc. will
help your Facilities Department immensely with the process of rebuilding your data center, corporate offices, or in the planning for
the acquisition of a new structure. In an emergency situation, time is money just as it is in the normal daily business world. If we as
contingency planners can plan and test for the knowns of emergency situations, then we will be better equipped to handle the
inevitable unknowns when they occur. After all, a contingency plan is merely a methodology that leads the way to an expedient
return to Business As Usual.
This article was written by Don Edwards, the Contingency Planner Coordinator for Puget Sound Bank in Washington State.
This article adapted from Vol. 2 No. 3, p. 36.
DR World Main Index | Return to DRJ's Homepage
Disaster Recovery Worldİ 1999, and Disaster Recovery Journalİ
1999, are copyrighted by Systems Support, Inc. All rights reserved. Reproduction
in whole or part is prohibited without the express written permission form
Systems Support, Inc.