The limiting factor in the usefulness of a disaster recovery plan is speed; maximizing the speed of
backup procedures and minimizing data restoration time is the name of the game. The cost benefits of
optimizing these parameters are really incalculable since the whole purpose of the plan is to allow
business critical functions to continue with as short an interruption as possible despite
operation-disrupting events.
The importance of fast VM system restoration was brought home to Dow Corning recently during a
hotsite test when the company tried, but failed, to complete a partial system restoration of the equivalent
of 120 single volumes of data in a 32-hour window. Had the restoration not been under test conditions,
a wide variety of business critical business operations running on the VM system would simply not have
been available for an extended period of time. The result could have been severe.
Dow Corning installed its VM system in 1983, and since that time applications and users have steadily
increased. The system now runs on an IBM 3090-400 and supports 6000 users worldwide.
The hotsite test underscored the firms dependence on the VM systems as well as the need for an
improved backup and restore system. Company officials responded by implementing
Syncsort/BACKUP (Syback).
Officials initially obtained the product on a trial basis just one month before the next hotsite test. Yet
even with that restricted time period, officials were able to shorten the restoration process to just three
hours and 25 minutes an improvement of almost 1000 percent, due primarily to an enormous
improvement in physical restoration time. Where the previous product required 3.6 hours to physically
restore the 11 volumes , the company needed to IPL the basic system. The new system completed the
same process two and one-half times faster in just 1.5 hours.
Because it took so long to physically restore files with the former system, the company depended on
logical backups. But logical restores are much slower to complete than physical restores even with the
fastest system because they are done on a minidisk by mindisk basis. To restore a system from
logical backups requires restoring minidisks individually by manually entering separate restore
commands for each minidisk from a hard copy file listing. Physical restores, by comparison, are done
cylinder by cylinder and require no file catalogue.
To restore all data to the point of a disaster (daily sync-point) with the former product would have taken
weeks and would have cost the company dearly. The goal of the new business continuation plan
(BCP) is complete restoration to the daily sync-point in just 16 hours.
Company officials are confident of achieving this goal because of the speed with which the new system
completes physical restores as well as its streamlined logical backup and restore process. In a
benchmark test, the former product took 25 minutes to logically back up a user volume comprised of
200-300 minidisks. The new system, by comparison, took half that time.
This fast logical backup time enables the company to improve its daily backup procedures as well. In
the past, each daily incremental backup only included data created since the previous daily incremental.
While this saved backup time, it greatly slowed restoration because as many as five tapes may be
required to complete a daily sync-point restoration.
To further optimize restoration speed, the new system supports up to 10 tape drives simultaneously and
features non-specific tape mounts. With an automatic tape loader each of which support 10 tapes
on each of our 10 tape drives, this means that restoring all 220 tapes used for weekly physical backups
only requires that the operator make sure the loaders are filled with tapes.
The cost benefits of optimizing backup and restore procedures are incalculable. Virtually all companies
depend on their data resources and should implement business continuation, or disaster recovery plans.
Stanley G. Pope is VM system programmer with Dow Corning Corporation in Midland, Michigan.
This article adapted from Vol. 6 #2.
DR World Main Index | Return to DRJ's Homepage
Disaster Recovery Worldİ 1999, and Disaster Recovery Journalİ
1999, are copyrighted by Systems Support, Inc. All rights reserved. Reproduction
in whole or part is prohibited without the express written permission form
Systems Support, Inc.