So Youre The Companys New Contingency Planner!
By William A. Hussong, Jr.
A little over a year ago, while attending a Disaster Recovery Conference, I had the opportunity to chat with a woman who had just
been assigned the task of preparing a Disaster Recovery Plan for her law firm. This task was part of a good news, bad news
scenario. She had been with the firm for many years and had just received a hard won promotion--the good news. Buried deep
inside her position description was something called the Firm Contingency Planner--the bad news. And, to complicate matters,
one of the junior partners had asked her what he was supposed to do if the firm had a problem.
She immediately got in touch with the previous incumbent and asked the obvious--what does a Firm Contingency Planner do, and
where is the Plan? She was told: nothing (because none of the Senior Partners cared), and yes, there is a Plan (circa late
1970's), but nobody ever reads it, and, finally, yes, Mr. X always asks that question--just tell him to stay home and someone will
give him a call.
Not being one to institutionalize the Status Quo, and being a person who wants to excel at every task, she set about trying to learn
what a contingency planner is, or should be.
Luckily, she had an acquaintance who knew someone who was going to attend something called a Disaster Recovery Conference.
She obtained the necessary information, received permission to attend, and there she was--a confused neophyte Contingency
Planner and conference attendee--full of questions and concerns, and not having a clue of where or how to get started.
So over the next couple of days I tried to walk her through the contingency planning process. I started off by congratulating her on
joining the ranks of the abused and misunderstood, and at the same time cautioned her that being a corporate contingency planner is
more than just a position description or title; it must become a mission, almost a Holy Quest, because most of the rewards will
come from within. I informed her that she will spend a considerable amount of energy planning for events she hopes and prays will
never happen, she will support people who dont care, and she will be held accountable for events and actions beyond her control.
Conversely, however, the position of contingency planner is one of the most interesting, challenging, and rewarding experiences
anyone could want. Having said that, I launched into my basic contingency planning commercial. My intent was neither to intimidate
nor train, but rather to give her a broad-brush awareness that the contingency planning business is neither an art nor a science,
rather, an imbroglio of opinions compiled from past experiences.
UNDERSTANDING
THE RULES
Private industry is subjected to many non-business related perils. Ironically, as technology advances, previously unknown or
nonexistent threats seem to continually evolve. These are in addition to the natural or man-made disasters normally considered.
Disasters can strike at any time; and, the more an organization is concentrated in a single location or geographic area, the greater the
risk that a single disastrous event could cause serious business disruption or organizational decapitation.
Yet, even in the face of overwhelming daily evidence, executive managers continue to resist the need for disaster contingency
planning. They rationalize that since they are not on a hurricane prone island, or sitting on an earthquake fault, they have no real need
to prepare for a disaster. They firmly believe that their organizations fiscal and strategic programs are quite adequate; the current
disaster response capability is adequate; and that nothing is broken, so why fix it?
The operative terms are adequate and not broken. Too often, adequate is used to limit refinements or further exploration. In
emergency planning, it stifles improvements. Not broken, coupled with adequacy, tends to hinder internal initiative and limit
outside observation or influence. Maintaining adequacy not only prevents progress, but also causes regression, which can lead to
failure. Progress cannot be made without some forward motion.
A side issue is NIH, Not Invented Here. If it was not the idea of a senior executive, it cannot be worth the expense to explore and
should be dismissed without further thought. These managers quote statistics to show that the risk of a major disaster is too small to
be of concern. They overlook the fact that disasters caused by HAZMAT incidents and power and phone outages are
unforeseeable, widespread, and often very damaging. Even if such managers do not totally resist disaster planning, they too often
pay the concept grudging lip service by quickly assembling a plan for insurance purposes, and then filing it away. Or, even worse,
they accept a mediocre plan believing that they are fully protected.
WHATS THE THREAT?
Risks--avoid, minimize, accept, BUT do not ignore!
Contingency planners base their plans upon a perceived threat in order to identify the resources required to counter that threat.
These threats can generally be classified into four broad categories: Accident--radiation leaks, chemical contamination, loss of
power, transportation incidents, toxic fumes, etc.; Natural--floods, fires, earthquakes, hurricanes, etc.; Internal--sabotage, theft, etc.;
and Armed Conflict--terrorism, civil insurrection, armed conflict, etc..
Boiled down to a simple sentence--A threat is any event that will deny you the use of your normal work area or the
telecommunications connectivity to that area.
GETTING STARTED
In all but the smallest organizations, adoption of a formal planning methodology is needed to ensure quality, consistency, and
comprehensiveness of the completed contingency plans. A standard methodology can also provide maximum assurance that the
plans for interrelated departmental functions (Administration, ADP, Communications, Finance, etc.) mesh properly to form a
cohesive program.
The ad hoc approach to contingency planning should absolutely be avoided. A formal and disciplined planning methodology will
ensure that plans address the total organization, not just survival of the pieces. Additionally, the planner should avoid fragmented
solutions such as building a contingency plan for the ADP Division that will ensure survival and recovery of data (computer
survival), but giving no thought to addressing the issues that ensures overall organizational survival.
A basic planning process will outline the requisite content for contingency plans including objectives, requirements, and a desired
format. This process will also determine: which type of disaster is most threatening to organizational survival, which key locations
and critical functions must be protected, and it will establish time-lines (i.e., the maximum amount of time an organization can be
without a critical capability) for unacceptable loss of capabilities. Each determination should include a critical, holistic, functional
assessment.
One of the vital talents that any contingency planner should acquire is the ability to think backward. Specifically, one must be able to
visualize hours, days, and even weeks into an event, and then mentally work backwards, asking at each step of the way,--how did I
get here?, what was needed?, and what is required at this instant in time?. As planners refine this talent, they will be able to
freeze frame specific phases of an event and analyze all the required actions and reactions that must take place to ensure a
successful disaster recovery operation.
THE PLAN
No one plans to fail, they just simply fail to plan. Developing an organizations disaster contingency plan is not a trivial
undertaking. It is a painstaking process. Furthermore, once the plan has been developed, it must be reviewed and updated whenever
the company adds new products, new facilities, new technology, or undergoes major internal changes. A disaster contingency plan
is the corporate blueprint for response and recovery. It must be sufficiently complete to allow the lowest operating element to know
precisely what to do and, if necessary, to move to an entirely new facility and resume operations--business as usual. The plan
follows the basic interrogatives--who, what, when, and how: who is involved; what resources are involved; when must the resources
be used; and how are they to be used. The plan must basically outline people responsibilities, the use of equipment and other
material resources, and detailed operating instructions; nothing can be assumed. The plan is the organizations strategic battle plan
for recovery. The follow-on contingency plans of the operating elements become the organizations tactical battle plans for survival.
BUT FIRST, THE CONCEPT
There are no permanent solutions, only evolving answers!
We are constantly bombarded with the need to produce THE PLAN. The plan thus becomes the end means of corporate survival
and recovery. What is rarely, if ever, mentioned is that the plan is an operational document that is designed to be implemented when
needed and, as such, it must be based on something authoritative. What is missing in the rush to produce THE PLAN is the
awareness that there is a crucial first step that should always be conducted.
No plan can be developed, or should even be attempted, without first performing an objective analysis of the organizations needs
and objectives. The contingency requirements, assumptions, and constraints must be clearly understood first before a pencil ever
touches paper for the first draft plan outline. The assessment must be conducted with meaningful participation by both management
and operational personnel. Participation by both groups is absolutely required. Although management establishes organizational
policy and planning objectives, it is the operational personnel who must execute the plan.
The end product of the analysis will be a well-documented Concept of Operation. It is this document that details the specific threat,
requirements, assumptions, constraints, and outlines a proposed general course of action. In global terms, it states what needs to
be done and forms the foundation document for the follow-up plans that deal in specifics. Furthermore, care must be taken to
ensure that it is not driven by a single solution. All possible solutions must be explored, analyzed, and each compared to the other.
Only after all other solutions have been eliminated, should the remaining solution be used as the basis for the concept.
As the foundation document for a plan, the Concept of Operation is the single authoritative document that addresses such elements
as: the critical and uninterrupted corporate activities or functions, the threat, the requirements, assumptions, and constraints. Also
imbedded in these elements are both risk and impact analysis. Should any of these elements change significantly, a revalidation of
the concept is absolutely required. Too often, either because of time or resource constraints, emergency managers take the easy way
out by modifying a plan without first taking the time to re-visit the basic concept. Unfortunately, history is full of examples of
contingency (mission) failures because the underpinnings of a plan had changed and no one thought it important to revalidate the
concept. Therefore, when the time came to execute the plan, it was found to be unusable.
A concept document differs from a support plan in that it is generalized and applies broadly to a large portion of the organizational
structure. Unlike a plan, it does not directly relate to a specific geographical area, specific time frame, or specific elements. It
explains general organizational and staff interrelationships and defines broad policies to be followed and the objectives to be
attained.
Guidelines for effective concept development are:
Keep it as short and simple as possible. Use an annex or appendix for lengthy discussions.
Avoid footnotes--they tend to distract the reader and too often appear as an afterthought, causing more questions than they answer.
The document must stand alone as the foundation source for any organizational activity or program; however, it is not the
document of execution.
A concept generally describes why and what needs to be done. The follow-on family-of-plans describe in specific detail the
who, where, and how.
Write for the reader(s). REMEMBER, the one who approves the concept may not be the one who must subsequently create the
supporting plans and procedures with nothing to work with but the concept.
Watch your language. Terms and phrases often mean different things to a manager and an operator.
Beware of preparing a Camel.
Concepts prepared for approval in Corporate Headquarters are often loosely worded political compromises that can result in
ambiguous guidance when sent to the field to execute.
Concepts prepared for approval and execution in the executive suite of Corporate Headquarters are vastly different in detail than
those prepared at the operating level.
In large and diverse corporations multiple concepts may, and most likely should, be required. In these situations, do not attempt to
create a single, all inclusive document that is everything to everybody--the result is usually a document so complicated that it is
unreadable and, therefore, worthless.
Remember your roots. The true acid test of any concept is the ability of the guys and gals in the outer offices to understand what
must be done, and then do it--without the need for a Corporate Headquarters adult around to interpret.
TESTING AND MAINTENANCE
It has often been said--and for good reason--that a plan isnt a plan until it has been tested. The adage that plans must be maintained
to accommodate change is also well known. Despite this awareness, surprisingly large numbers of organizations commit significant
resources to contingency plan development only to see the value of the investment dwindle as time passes. This wasteful attrition is
usually due to an unwillingness to test and maintain the very plans that were created for organizational survival. This usually occurs
when a company has been fortunate enough to not experience a crisis for a prolonged period. The ensuing complacency lures the
organization into the classic its not broken trap!
Contingency plans are extremely dynamic. Things change. Most emergency and contingency operations usually require a complete
rewrite of all procedures every five years. These rewrites should be based on a refinement of requirements, exploit new technology
and use fresh eyes to look at old solutions to new problems. This process is called plan maintenance.
GETTING HELP
To develop a contingency plan, three basic options--or some combination of the three--are available to the contingency planner.
These options are to: complete the work in-house; obtain assistance from a specialized disaster software and/or storage vendor; or
hire an outside (disinterested) contingency planning consultant to assist in plan development.
In-house: This option often appears to be the cheapest because no additional expenditures are required. However, there are hidden
costs as employees are diverted from their normal work and, therefore, some of their normal work assignments may not get done.
Furthermore, it usually takes longer to complete the plans which often prove to be inadequate. This is especially true if in-house
personnel lack contingency planning expertise and experience. Moreover, because the planning effort can siphon off energy from
day-to-day activities, supervisors tend not to offer their very best employees to participate.
Specialized vendors: This approach varies in cost. However, as these vendors tend to concentrate on data storage and transfer
issues, and on telecommunications services, it is often better to defer the use of their services until there are known needs and
requirements. Although there are very good vendors in this area, some are focused on providing a very limited service and are not
concerned with synergistic organizational survival.
Outside (disinterested) consultant: On the surface, this option appears to be the most expensive. However, it is the most predictable
option to ensure complete, tailored assistance. When weighted against internal employee costs of trying to get organized, false
starts, and the internal strife in-house efforts cause, the actual expense of consultants may actually prove to be no more (and
sometimes less) than the in-house option. Consultants can provide outstanding assistance in helping understand the total planning
process.
A combination: More often than not, a combination provides the best of all options. By selectively using only the outside assistance
required for each step, combined with the use and training of in-house assets, the entire process is significantly accelerated.
Furthermore, it ensures that expertise is available when needed, and that all additional specialized assistance is pre-identified as
absolutely required to satisfy specific corporate contingency objectives. And, with adequate staff participation, this approach
ensures that planning knowledge becomes embedded inside the company. However, to reach its full potential, this option requires
the organizations Contingency Planner to strategically, and relentlessly, manage the process.
SUMMARY
Every day, businesses are confronted with disasters of varying degrees. Those that have adequately developed, maintained, and
exercised their contingency plans will survive. Yet many corporate executives continue to take the uninhibited operations of their
companies for granted. They remain complacent, assuming that the power will always be available, the telephone system will not fail,
there will be no fire or earthquake--everything will always be normal. Very few executives plan for their own, much less their
organizations mortality; however, if a business is to survive, organizational strategic and tactical battle planning is essential.
The final corporate contingency plan is the lifeblood of corporate survival. However, it is only as good as the foundation upon
which it was built. The foundation is, of course, the concept. This document is the means by which a particular mission, program,
or policy directive is translated into a fundamental organizational and operational methodology. Once the concept is developed
through a logical building block approach, and is sanctioned by both management and the operating elements, construction of the
contingency plan may commence.
A fundamental premise of successful contingency planning is that plans are developed by those who must actually carry them out in
the event of an actual disaster. The role of the Corporate Contingency Planner is to strategically, and relentlessly, manage the
process. And, in doing so, he or she must rely on both internal and external assistance. In addition to in-house assistance, there are
a multitude of disaster assistance organizations and services available to assist the contingency planner. However, many are
specialized and provide only a specific function (communications, data storage, etc.). As a consequence, synergistic contingency
planning is often left to the users resourcefulness.
Preparing a corporate contingency plan is a non-trivial undertaking. However, corporate leaders must recognize the vulnerabilities
they invite by not adequately planning for survival. Disaster planning is truly a vital part of the overall business plan.
EPILOGUE
I have spoken to the perplexed woman from the conference a few times since our chance encounter. Like most of the rest of us, she
enjoys the challenges of being a contingency planner, despite the inherent frustrations of dealing with changing threats, corporate
commitments, lack of resources, and the ever-present budget. Having developed this perverted addiction, she has truly earned the
right to calmly listen, as a veteran, to the next rookie planner as they expound on their seemingly futile quest to save their company
from imminent destruction.
William A. Hussong Jr. is the Senior Member of the Professional Staff of the Special Operations Division of System Research Applications, Inc., of Arlington, VA.
DR World Main Index | Return to DRJ's Homepage
Disaster Recovery Worldİ 1999, and Disaster Recovery Journalİ
1999, are copyrighted by Systems Support, Inc. All rights reserved. Reproduction
in whole or part is prohibited without the express written permission form
Systems Support, Inc.